Monday, April 21, 2014

Floors Down, Framing Up

So, where are we? 



Well, we now plywood covering the floors pretty much throughout, the downstairs bathroom has finally been ripped out (good riddance!) the old brass pipes running from the cellar have been replaced with shiny new copper, the old cloth covered wiring has been cleared out and updated in the cellar, we have 2x4's studs up framing out the master bath and all the closets upstairs and the office and finally, we made the decision not to move the column of pipes at the bottom of stairs. 

Office
Master Bath
This last one had us "umming and arring" for many many days but ultimately we came to the conclusion that it was an awful lot of money and way too much risk of disruption for our upstairs neighbours = big headaches for us!


Shiny new copper pipes


No comments:

Post a Comment